A recent structural survey at All Saints' showed that there is a backlog of repairs which need to be carried out on our church, some urgently. Issues have been identified with the roof, the drainage system and some parts of the walls.
The first phase of the work will look to fix the area of highest concern which is the roofs and valleys over the east end of the church. Phase 1 costs totalled around £230,000, with Phase 2 estimated at £455,000 with other work to follow.
The total amount we are trying to raise to cover all work needed is £750,000.